Curtain Wall Installation: The Cosmopolitan Resort Casino
Las Vegas, NV
Contractor: Far East Aluminum
Project Scope
Installation of curtain wall and glass on sheer walls.
Challenges
- The type of curtain wall being installed required attachment at both the uppermost and lowermost locations on the panel.
- Initiating curtain wall installation before completion of the roof required upper floor rigging positions.
- Frequent moves of the rigging position and tight project timelines required a fast rigging method for sheer walls.
Solution
5 double-deck platforms, varying from 25 ft (7.6 m) to
30 ft (9.1 m) long, powered by SC1500 and SC40 traction hoists; sheer wall brackets with double eyes; 16 ft (4.9 m) beam sets rigged with post shores to eliminate counterweights.
Related Products
- SpiderMod Modular Platform
- SC1500 Hoist
- Post Shore System