Service Glass Industries, Inc.
(click on thumbnail to enlarge)
Curtain Wall Installation
The Wharf - Parcel 5 Hotels - Washington, D.C.
Contractors:Service Glass Industries, Inc.
Project Scope:
Installation of curtain wall panels on new construction at The Wharf - Parcel 5 Hotels in Washington, D.C.
Click to view the full pdf case study, including
Spider's solution
Western Building Group
(click on thumbnail to enlarge)
Curtain Wall Installation
McConnell Air Force Base – Wichita, KS
Contractors:Western Building Group
Project Scope:
Installation of curtain wall panels on new construction at the McConnell Air Force
Base in Wichita, Kansas
Click to view the full pdf case study, including
Spider's solution
Panama Canal – Panama
(click on thumbnail to enlarge)
Suspended Access Solutions for Panama Canal Expansion – Panama
Contractor: Duero Latina
Project Scope:
Spider has played a critical role for the construction of the Pacific and Atlantic
third locks, being named the sole provider of suspended access equipment for the
precision installation of over 700 rail and valve assemblies that will respectively
control the entrance and exit of water through the locks.
Click to view the full pdf case study, including
Spider's solution
Glass Replacement – Seattle, WA
(click on thumbnail to enlarge)
Glass Replacement – Seattle, WA
Contractor: All New Glass
Project Scope:
The customer required suspended access and material lifting capabilities for glass
repair work on a 10-story commercial office building in downtown Seattle
Click to view the full pdf case study, including
Spider's solution
Trump International Hotel & Tower
(click on thumbnail to enlarge)
Trump International Hotel & Tower - Chicago, IL
Contractors: Brand Scaffold, Poblocki Sign Company
Project Scope:
The customers required access to the façade of Chicago’s second tallest skyscraper,
Trump International Hotel and Tower, for the installation of the massive stainless
steel, LED backlit ‘TRUMP’ letters to the building’s 15th floor level.
Click to view the full pdf case study, including
Spider's solution
Benson Industries
(click on thumbnail to enlarge)
World Trade Center Towers
World Trade Center Towers – New York City, NY
Contractors: Benson Industries Inc.
Project Scope:
The contractor was responsible for glass curtain wall and glazing installation,
glass repairs, and louver work on One World Trade Center and Tower Four
Click to view the full pdf case study, including Spider's
solution
The Josephinum Apartment Building
(click on thumbnail to enlarge)
Success on a 3-Story – St Louis, MO
Contractor: Mid America Metals
Project Scope:
The customer required access to the façade of the 3-story Thomson-Reuters office
building in St. Louis to clean and refinish metal panels.
Click to view the full pdf case study, including
Spider's solution
The Josephinum Apartment Building
(click on thumbnail to enlarge)
The Josephinum Apartment Building Masonry Restoration – Seattle, WA
Contractor: Elite Construction
Project Scope:
The customer required external access to the 14-story landmark apartment building
in downtown Seattle for masonry restoration work.
Click to view the full pdf case study, including
Spider's solution
Marseilles Apartments using Modular Platforms
(click on thumbnail to enlarge)
Waterproofing
Marseilles Apartments, Section 8 Housing - New York City, NY
Contractor: BSK Restoration
Project Scope:
Install waterproofing and ice shield protection to the building's exterior
Click
to view the full pdf case study, including Spider's
solution
Electric Spider Work Basket
(click on thumbnail to enlarge)
Glass Installation
Revolution Tower - Panama City, Panama
Contractors: Estructuras Y Remodelaciones
Project Scope:
Glass installation on both the vertical face and the underside of 48 projecting
floor levels.
Click to
view the full pdf case study, including Spider's
solution
PCL Constructors Westcoast
(click on thumbnail to enlarge)
Rolling Blind Installation
Vancouver Convention Center - Vancouver, BC Canada
Contractors: PCL Constructors Westcoast, Inc.
Project Scope:
Provide access for the installation of rolling blinds above escalator.
Click to view the full pdf case study, including Spider's
solution
The Architect of the Capitol
(click on thumbnail to enlarge)
Sign Installation
US Capitol - Washington, DC
Contractors: The Architect of the Capitol (AOC)
Project Scope:
Provide training and access expertise for the installation of the American flags
that served as the background for President Obama’s 2009 inaugural platform
Click to view
the full pdf case study, including Spider's solution
Curtis Glass, Lansing Glass, & Turner Brooks
(click on thumbnail to enlarge)
Stadium Renovations
University of Michigan - Ann Arbor, MI
Contractors: Curtis Glass, Lansing Glass, & Turner Brooks
Project Scope:
Provide access to increase handicap-accessible seating, replace bleachers, widen
individual seats and aisles, and add a new press box as well as luxury boxes and
club seats to the Wolverine Football Stadium
Click
to view the full pdf case study, including Spider's
solution
Resource Rig Supply
(click on thumbnail to enlarge)
Offshore Access
Adriatic IX Triangular Platform - Gulf of Mexico
Contractors: Resource Rig Supply, Inc - Houston, TX
Project Scope:
Provide complete access for maneuvering up and down the interior and exterior of
a 400 ft (121.9 m) jack up leg on the Adriatic IX offshore drilling rig for offshore
repair, blasting and painting.
Click to view the full pdf case study, including Spider's
solution
Buckland & Taylor, Ltd
(click on thumbnail to enlarge)
Bridge Work
Spences Bridge - BC Canada
Contractors: Buckland & Taylor, Ltd. – Bridge Engineering
Project Scope:
Provide access for inspection of the entire underside of the 700 ft (213.4 m) bridge
including all trusses both longitudinally and across the span. In addition, each
pier of the bridge was inspected down to the water level.
Click to
view the full pdf case study, including Spider's
solution
SpiderLine™ O’hare Automated Transit System
Bridge
(click on thumbnail to enlarge)
SpiderLine™ O’hare Automated Transit
System Bridge
Chicago, IL
Contractor: Rossi Contractors, Inc.
Project Scope:
Widening of a span of the O’hare Automated Transit System Bridge over I-90 in Chicago
Click to view the full pdf case study, including
Spider's solution
SpiderLine™ Fall Protection
(click on thumbnail to enlarge)
SpiderLine™ Fall Protection
Arcellor Mittal Steel Mill - Burns Harbor, IN
Contractor: Morrison
Project Scope:
The customer was faced with potential fall hazards while cleaning the Arcellor Mittal
steel mill’s roof gutters.
Click to view the full pdf case study, including
Spider's solution
LINQ Hotel - Beta Max Hoist
(click on thumbnail to enlarge)
Material Lifting on
LINQ Hotel – Las Vegas, NV
Contractor: NorthStar Contracting Group Inc.
Project Scope:
During the $223-million transformation of the former Imperial Palace into Caesars
Entertainment’s newest 2,256-room hotel and casino, the LINQ, 3,250 cement guardrail
barriers needed to be safely removed from the structure’s exterior balconies and
transported to ground level
Click to view the full pdf case study, including
Spider's solution
Beta Max Hoist
(click on thumbnail to enlarge)
Material Lifting
Eli Roth's Goretorium - Las Vegas, NV
Contractor: Gist Décor working under Forte Construction
Project Scope:
Eli Roth's Goretorium is a haunted chapel on the Las Vegas strip. After couples
pronounce their marriage vows, a decorative wall of zombies rises in the background.
The contractor required a permanent material hoist to repeatedly lift and lower
the 8 ft (2.4 m) x 10 ft (3.1 m), 750 lb (340.2 kg) wall as part of the theatre's
production.
Click
to view the full pdf case study, including Spider's
solution
San Francisco - Oakland Bay Bridge
(click on thumbnail to enlarge)
San Francisco - Oakland Bay Bridge - San Francisco, CA
Contractor: American Bridge/Fluor Joint Venture
Project Scope: The customer required access to the bridge’s cables,
underside of its roadway deck, and its 525 ft tall tower throughout the eight year
construction of the new self-anchor suspension span of the San Francisco – Oakland
Bay Bridge in California.
Click to view the full pdf case study, including
Spider's solution
Shell Martinez Flexi-Coker Unit Expanding Platform
(click on thumbnail to enlarge)
Shell Martinez Flexi-Coker Unit Expanding Platform – Martinez, CA
Customer: Shell Martinez
Project Scope:
The customer required a circular platform that was able to expand to stay near the
walls of a cone-shaped flexi-coker unit. Increased lifting capacity was required
to enable a hydraulic chipping machine to remove coke for maintenance and inspection
of the tower.
Click to view the full pdf case study,
including Spider's solution
Tesoro Golden Eagle Refinery Unit #6
(click on thumbnail to enlarge)
Tesoro Golden Eagle Refinery Unit #6 Chimney Refractory Repair – Martinez, CA
Contractor: JT Thorpe & Son
Project Scope:
The customer required internal access to the 350-ft tall chimney for safety inspection,
demolition of existing refractory block in the work zone, surface preparation, coating
and re-lining of the chimney wall.
Click to view the full pdf case study, including Spider's solution
Hymach Industries
(click on thumbnail to enlarge)
Bridge Work
CN Rail Second Narrows Swing Bridge - Vancouver, BC Canada
Owner: Canadian National Railway
Contractors: Hymach Industries
Project Scope:
Throughout the projects two month duration Spider
provided access for Hymach Industries to service the roller guide wheels for the
lift mechanism on the four columns of the bridge towers. The Second Narrows bridge
is immediately east of the Lions Gate Bridge and connects North Vancouver to Vancouver
over the Burrard Inlet 150 ft (45.7 m) below. This active waterway is manned 24/7
to enable vessel traffic to pass unimpeded through the inlet.
Click to view the full pdf case study, including Spider's
solution
Hadek Protective Systems
(click on thumbnail to enlarge)
Stack Access
Oak Grove Power Plant - Waco, TX
Contractors: Hadek Protective Systems BV – a Dutch company
doing its first US project ever
Project Scope:
Installation of a Pennguard® ceramic brick liner to a 450 ft (137.2 m) tall
stack
Click
to view the full pdf case study, including Spider's
solution
Hadek Protective Systems
(click on thumbnail to enlarge)
Tank Access
Gulf Power/Crist Plant - Pensacola, FL
Contractors: SealTech
Facility Owner: Gulf Power
Project Scope:
Provide access to the jet bubble reactor’s upper tank wall and beams for sanding,
joint finishing, and joining beams to tank wall, and to beams to install piping
for the cooling process
Click
to view the full pdf case study, including Spider's
solution
LPR
(click on thumbnail to enlarge)
Processing Plant Access
ThyssenKrupp USA Steel Processing Plant - Calvert, AL
Contractors: LPR
Facility Owner: ThyssenKrupp USA
Project Scope:
Provide access for the installation of steel girder beams on the 175 ft (53.3 m)
wide, 234 ft (71.3 m) tall hot dip galvanizing line structure of the steel processing
plant.
Click to view the full pdf case study, including
Spider's solution
Cannon Sline
(click on thumbnail to enlarge)
Power Plant Maintenance
AEP Cardinal Station Unit 3 Cooling Tower - Brilliant, OH
Contractors: Cannon Sline Inc.
Project Scope:
Inspect, repair and coat entire interior surface of cooling tower with dimensions
200 ft (61 m) in diameter and 424 ft (129.2 m) high
Click to view the full pdf case study, including
Spider's solution
Cannon Sline
(click on thumbnail to enlarge)
Nuclear Plant Work
TVA Watts Bar Nuclear Plant - Spring City, TN
Contractors: Bechtel Power Corp.
Project Scope:
Customer needed to remove and replace a section of the steel spray containment vessel
and concrete containment vessels to allow the replacement of the steam drum.
Click to view the full pdf case study, including Spider's
solution